Hardwood Before You Buy
Knowing what to expect and being prepared will also be a lot less stressful on you, your family and your home.
- Get a recommendation
- Installing hardwood flooring is hard, exacting – detailed
- Have it done by our seasoned professionals
Before installation day
- Relocate furniture
- Empty china cabinets and closets
- Consider removal and disposal of old floor covering
- Remove it yourself and leave 1 day before install
- For carpet, leave tack strips and pull out staples
Trim
- Moldings and baseboards removed for additional costs
- Installers not responsible for breakage
- Painted baseboards, woodwork and paint may need retouching (your responsibility)
Subflooring
- May need to be prepared
- New subfloor may be required
- A job best left to the professionals
Door plan
- Possibility that doors may not clear the new floor and swing free
- Installers may remove doors and re-hang for an additional cost.
- For clearance issues, arrange for a qualified carpenter to shave or cut down
Clean-up
- Waste will be produced
- Waste collected and disposed of by installers at an additional cost
Installation day
- Be home and available
- Be prepared for questions
- Presence ensures the right wood is installed in the right areas
- Exact time of arrival cannot be guaranteed, only a time frame
Safety
- Installers use tools and techniques that can be hazardous
- Make sure that children and pets are out of the work area
- Follow through with a walk-through
- Prior to completion, walk through to ask questions and be clear on any final details
After installation day
- Establish good ventilation for 48 to 72 hours
- Being prepared for installation day will make your life and the installers a lot easier